New piping within 24 hours

Already in 2010, preparations began for the new paper machine. This was followed by the assignment of the pipe bridge, the steam pipe DN 600 and the condensate line DN 150 had to be changed. Integrations and Umschlüsse were in a 24-hour standstill realized by us.

Our tasks included the complete piping of the new paper machine and the full piping stock preparation steam and condensate side. In addition, were we commissioned with the piping of the new steam turbine nine parallel to PM 4 mounting.